Data center site selection: Virginia, Carolinas, Ohio

33 listings

Candidate parcels, substations, fiber meet-me points and existing campuses, shaded by state incentive score. Sample data. Every developer, campus and carrier shown is invented.

  • Beaumeade Ridge Parcel

    21000 Atlantic Blvd, Sterling, VA 20166, USA

    Under contract · Available MW 150

    62-acre assemblage zoned for data center use, two roads in. Power study shows 150 MW deliverable in 30 months, but the second 150 MW waits on a new 230 kV line.

  • Sycolin Creek Pad

    Sycolin Rd SE, Leesburg, VA 20175, USA

    Pursued · Available MW 90

    Flat 41-acre pad next to the airport buffer zone. Strong fiber on the road, but the nearest substation is already spoken for until 2028.

  • Godwin Drive Lot 4

    9500 Godwin Dr, Manassas, VA 20110, USA

    Option · Available MW 60

    Industrial-park lot with the buildings already cleared. Water is a 12 inch main at the lot line; the town wants a cooling plan before it will sign a letter.

  • Brandy Station Tract

    Brandy Rd, Culpeper, VA, USA

    Pursued · Available MW 300

    118 acres of cleared farmland off Route 29 with a high-voltage corridor across the north edge. Cheapest land per acre on the shortlist, one carrier on site so far.

  • White Oak Block C

    5900 Technology Blvd, Sandston, VA 23150, USA

    Under contract · Available MW 120

    Fits 55 acres inside an established technology park, with reclaimed water piped to the park. The Henrico incentive package is the best we have seen in Virginia.

  • Meadowville South Parcel

    Meadowville Technology Pkwy, Virginia 23836, USA

    Option · Available MW 200

    Rail spur and river access to the east. Power is plentiful on paper, but the interconnection queue is 36 months. Parcel is held under a 9 month option.

  • Perimeter Park Lot 12

    2000 Perimeter Park Dr, Morrisville, NC 27560, USA

    Passed · Available MW 40

    Short-fiber option 4 miles from the research park. Only 24 acres, so a single 40 MW building, with water from the county line.

  • Steele Creek Industrial Tract

    11000 Westinghouse Blvd, Charlotte, NC 28278, USA

    Under contract · Available MW 180

    73 acres by the airport freight loop. Two substations within two miles; the owner will sell only with a 12 month closing window.

  • Apex West Parcel

    Apex Peakway, Apex, NC 27502, USA

    Option · Available MW 75

    Flat site in a town that has not seen a campus before: the planning board hearing is the real schedule risk. Well water would need a state permit.

  • Walton Parkway West Site

    7000 Walton Pkwy, New Albany, OH 43054, USA

    Under contract · Available MW 200

    Corner site in the business park with shovel-ready utilities. Tax abatement is negotiated up front, and the utility has penciled 200 MW by 2029.

  • Blazer Parkway Parcel

    7500 Blazer Pkwy, Dublin, OH 43017, USA

    Pursued · Available MW 70

    Redevelopment of an old office campus: 33 acres, shell buildings can be reused for a first 30 MW phase. City supports reclaimed water for cooling.

  • Parkway Lane Industrial Site

    3800 Parkway Ln, Hilliard, OH 43026, USA

    Passed · Available MW 40

    Brownfield cleared in 2022 with remediation signed off. Limited by 40 MW of headroom, but fastest permit path of any parcel in Ohio.

  • Neubrecht Road Farm

    Neubrecht Rd, Lima, OH 45801, USA

    Pursued · Available MW 250

    Rural 160 acre block west of town with room for a three-building campus. Needs a new substation to move past 50 MW, and has no municipal water.

  • Ashburn North 230 kV Substation

    Loudoun County Pkwy & Waxpool Rd, Ashburn, VA 20147, USA

    Available MW 60

    Switching station on the east side of Loudoun County Pkwy near Waxpool Rd. Our shared view of how much headroom the utility will confirm.

  • Sterling Junction Substation

    Atlantic & Magnolia, Sterling, VA 20166, USA

    Available MW 25

    Site description only: a fenced yard behind the industrial row off Atlantic Blvd. Feeds the Beaumeade parcels; transformer upgrade due in 2028.

  • Culpeper Corridor Substation

    Brandy Rd & James Madison Hwy, Culpeper, VA 22701, USA

    Available MW 180

    Where the northern high-voltage corridor meets Route 29. A study to add a second transformer is underway.

  • Sandston Bulk Station

    Technology Blvd, Virginia 23150, USA

    Available MW 110

    Bulk power station beside the technology park gate, with two 230 kV feeds. Headroom is shared with the neighboring industrial users.

  • Steele Creek 230 kV Switchyard

    Steele Creek Rd & Westinghouse Blvd, Charlotte, NC 28273, USA

    Available MW 150

    Open-air switchyard a half mile from the airport freight loop. Two lines in, one reserved for the existing customer.

  • New Albany West Substation

    8000 Walton Pkwy #200, New Albany, OH 43054, USA

    Available MW 130

    Substation at the edge of the business park. Utility has committed to a 345 kV tap if a customer signs for 150 MW or more.

  • Lima South Station

    E Bluelick Rd, Lima, OH 45801, USA

    Available MW 20

    Rural station on Bluelick Rd serving farm and refinery loads. Little spare capacity today; this is why Neubrecht Road needs new build.

  • Ashburn Meet-Me Point

    Ashburn Village Blvd & Waxpool Rd, Ashburn, VA 20147, USA

    Carrier-neutral meet-me hub on Waxpool Rd with the densest cross-connect options in the region. Parcels within 6 miles qualify for low-latency routes.

  • Richmond Metro Hub

    N 7th St & E Broad St, Richmond, VA 23219, USA

    Downtown carrier hotel at Broad and 7th. Backhaul to Sandston and Chester is by two diverse paths.

  • Raleigh Exchange Point

    Fayetteville St & W Hargett St, Raleigh, NC 27601, USA

    Meet-me room above Fayetteville Street; reaches the research park in under a millisecond of added delay.

  • Charlotte Gateway Hub

    S Tryon St & W 4th St, Charlotte, NC 28281, USA

    Uptown interconnection point on Tryon St with a ring that loops out to the airport corridor and Steele Creek.

  • Columbus Interconnect

    E Gay St & N High St, Columbus, OH 43215, USA

    Downtown hub with long-haul routes to Chicago and Pittsburgh. Dublin and New Albany tails are lit, Lima is not yet.

  • Beaumeade Commons Campus

    44800 Prentice Dr, Sterling, VA 20166, USA

    Existing 6 building campus, fully leased. The utility's loads here set the benchmark we use to size Beaumeade Ridge.

  • Dulles Gateway Campus

    22700 Glenn Dr, Sterling, VA 20164, USA

    Older 2 building campus, 40 MW, mostly retail colocation. Still the best proof that Dulles pricing holds above market.

  • Godwin Corridor Campus

    10000 Godwin Dr, Manassas, VA 20110, USA

    Single 30 MW building, opened 2024. Reclaimed water connection proves the town will approve a cooling plan.

  • Beech Road Campus

    7500 Beech Rd NW, Johnstown, OH 43031, USA

    Three-building campus on 120 acres, anchored by a hyperscale tenant. Shows New Albany can absorb 200 MW or more.

  • Airport Freight Campus

    4401 Westinghouse Blvd, Charlotte, NC 28273, USA

    35 MW enterprise campus with a 10 year utility agreement. Used as the NC rate comparison.

  • Northern Virginia Economic Development Desk

    101 Blue Seal Dr SE, Leesburg, VA 20175, USA

    The utility's large-load desk for Loudoun and Prince William. Ask for a will-serve letter with a delivery date, not a megawatt range.

  • Central Virginia Power Planning Office

    suite 1300, 919 E Main St, Richmond, VA 23219, USA

    Handles Henrico and Chesterfield requests. The study fee for a 100 MW request is refundable if you sign.

  • Central Ohio Economic Development Office

    77 N Front St, Columbus, OH 43215, USA

    Single contact for New Albany, Dublin and Hilliard. Will convene the utility and the city in one call.